Produksi — Analisis Tren & Heatmap Pencapaian Produksi TBS
YTD Produksi TBS
Jan–Apr 2026 · 3 Kebun
48,750ton
97.5%
+3.2% vs periode sama 2025 target 50,000 ton
BJR Rata-rata
Berat Janjang Rata-rata
22.2kg
98.7%
-0.3 kg vs target 22.5 kg Divisi III lemah
OER Pabrik
Oil Extraction Rate PKS
23.3%
97.9%
+0.1% vs target 23.2% Excellent!
Tren Produksi TBS & BJR — 12 Bulan
TBS Aktual Target BJR
Peak: Jul 2026 · 4,680 ton
Low: Feb 2026 · 3,650 ton
BJR Range: 22.0–22.8 kg
Distribusi per Kebun
Sei Rokan (SR)
12,500 ha · Riau
57%
Batang Hari (BH)
8,500 ha · Jambi
26%
Musi Banyuasin (MB)
6,200 ha · Sumsel
17%
Heatmap Pencapaian — Produksi per Kebun × Bulan
≥100% Target 90–99% <90%
Kebun JanFebMarApr MeiJunJulAgu SepOktNovDes YTD
Ranking Produktivitas Blok
Top 5 Blok — Produksi Tertinggi
YTD 2026
Bottom 5 Blok — Perlu Perhatian
Perlu Tindak Lanjut
Biaya — Analisis Biaya Operasional & Efisiensi Cost per Ton
Biaya per Ha
YTD Jan–Apr 2026
1,842K/ha
91.1%
-8.9% vs budget Rp 2,020K/ha efisiensi
Total Biaya Operasional
3 Kebun · 27,200 ha
50.1M
90.2%
Rp 55.5M budget · hemat Rp 5.4M
Biaya per Ton TBS
Cost of Production
1,028K/ton
94.0%
+2.1% efisiensi vs 2025
Rasio Biaya/Pendapatan
Cost-to-Revenue Ratio
42.3%
84.6% efisiensi
target <45% · Good
Biaya Aktual vs Budget — per Bulan (Rp Juta)
Aktual Budget
Breakdown Kategori Biaya YTD
Kategori Budget (Rp M) Aktual (Rp M) Selisih % Budget Status
Pupuk & Herbisida 18,420 16,880 -1,540 91.6% On Track
Biaya Panen 14,200 13,450 -750 94.7% On Track
Pemeliharaan Lahan 9,800 10,120 +320 103.3% Over
Overhead & Admin 8,600 7,820 -780 90.9% On Track
Lain-lain 4,480 1,830 -2,650 40.8% Efisien
TOTAL 55,500 50,100 -5,400 90.3% Surplus
Komposisi Biaya
Pupuk & Herbisida 33.7%
Biaya Panen 26.8%
Pemeliharaan 20.2%
Overhead 15.6%
Lain-lain 3.7%
Biaya/Ha per Kebun
Sei Rokan (SR) Rp 1,720K
Batang Hari (BH) Rp 1,960K
Musi Banyuasin (MB) Rp 2,080K
Budget/ha: Rp 2,020K — MB over budget
Tren Biaya per Ha — 12 Bulan (Rp Ribu)
Avg Biaya/Ha
Rp 1,842K
Biaya Tertinggi
Rp 2,280K
Mar (puncak pemupukan)
Biaya Terendah
Rp 1,540K
Jan (awal tahun)
Proyeksi Full Year
Rp 1,910K/ha
-5.4% vs budget
Kinerja Mandor — Monitoring Produktivitas & Performa Tim
Total Mandor Aktif
3 Kebun · 12 Divisi
48orang
2 mandor baru bergabung Mar 2026
Pencapaian Rata-rata
YTD vs Target
94.8%
94.8%
+2.3% vs Q1 2025
Total Premi Dibayar
YTD Jan–Apr 2026
486Juta
Avg Rp 10.1jt/mandor
Tingkat Kehadiran
Rata-rata semua mandor
96.2%
96.2%
Excellent
Ranking Kinerja Mandor — YTD 2026
# Nama Mandor Divisi / Kebun Pencapaian BJR Avg Premi YTD Hadir Trend Status
Distribusi Kinerja
≥100% Target 14 mandor
90–99% 22 mandor
80–89% 9 mandor
<80% 3 mandor
Premi per Kategori
Premi Produksi Rp 312jt
Premi BJR Rp 98jt
Premi Kehadiran Rp 48jt
Premi Kualitas Rp 28jt
Total Rp 486jt
Pencapaian vs Target — Top 10 Mandor
Aktual Target
Pola Absensi Mandor — Apr 2026
Hadir
Izin/Sakit
Alpa
Libur
Prediksi — Model AI & Forecasting Produksi
AI/ML Forecast Engine — AKTIF
Model: LSTM + XGBoost Ensemble · Dilatih dengan data 5 tahun (2020–2024) · Update otomatis setiap hari Senin
LSTM + XGBoost MAPE: 4.2% Update: 19 Apr 2026
Model Accuracy
1 – MAPE
95.8%
Excellent
+1.2% vs model Q1
Prediksi 6 Bulan
Mei – Okt 2026
26,480ton
+2.8% vs target periode sama
Confidence Interval
±95% CI range
±4.8%
Narrow CI — reliable forecast
Training Data Points
Historical records
18,240rows
5 tahun × blok × hari
Prediksi Produksi 6 Bulan — AI/ML Forecast AI Model Active
Aktual (Jan–Apr)
Forecast (Mei–Okt)
Confidence Interval (±95%)
Prediksi Total 6M
26,480 ton
vs Target
+2.8%
Model Accuracy
95.8%
Feature Importance
XGBoost
Model Architecture
LSTM Layer 128 units · 3 layers
XGBoost Trees 500 estimators
Ensemble Weight 60% LSTM / 40% XGB
Lookback Window 90 hari
Re-train Schedule Setiap Minggu
Analisis Skenario — Proyeksi Full Year 2026
Skenario Optimis
+15% Curah Hujan
98,400ton
+8.2% vs target tahunan
Asumsi curah hujan180 mm/bln
BJR target23.0 kg
OER pabrik23.8%
Probability: 18%
Skenario Base Case
Model AI
91,200ton
+2.8% vs target tahunan
Asumsi curah hujan140 mm/bln
BJR target22.5 kg
OER pabrik23.3%
Probability: 62% · Most Likely
Skenario Pesimis
El Niño Risk
82,600ton
-6.8% vs target tahunan
Asumsi curah hujan90 mm/bln
BJR target21.5 kg
OER pabrik22.8%
Probability: 20%
Proyeksi 3 Skenario — Mei–Des 2026
What-If Analysis
Curah Hujan (mm/bln)
60 mm140 mm220 mm
Target BJR (kg)
20 kg22.5 kg25 kg
Luas Panen (%)
70%92%100%
Estimasi Produksi
91,200 ton
vs Target: +2.8%
Export Data & Laporan
Format tersedia: CSV · Excel · PDF · JSON
Produksi Bulanan
TBS, BJR, OER per kebun dan divisi. Periode: Jan–Apr 2026
CSV
XLS
PDF
Kinerja Mandor
Pencapaian target, premi, dan absensi seluruh mandor aktif
CSV
XLS
PDF
Biaya per Hektare
Breakdown biaya operasional per ha per kategori dan kebun
CSV
XLS
PDF
AI Forecast Report
Prediksi 6 bulan, skenario analisis, feature importance
CSV
XLS
PDF
Laporan Terjadwal
Weekly Production Summary
Setiap Senin 07:00 → CEO, GM, Estate Manager
Aktif
Monthly Financial Report
Tanggal 5 setiap bulan → Finance Manager, CEO
Aktif
AI Forecast Weekly
Setiap Senin 06:00 → GM, Estate Manager
Aktif
Block Drill-down — Analisis Kinerja per Blok
Kinerja 20 Blok — Divisi II, Apr 2026
BlokLuas (ha)TBS/havs TargetBJRAKPScore
D2-A0132.43.21+12%24.292%A
D2-A0228.73.08+7%23.888%A
D2-A0330.12.86−1%23.585%B+
D2-B0135.22.74−5%23.182%B
D2-B0229.82.51−12%22.478%C+
D2-B0327.52.18−24%21.871%D
D2-C0133.13.15+9%24.090%A
D2-C0231.42.92+2%23.686%B+
Blok Perlu Perhatian: D2-B03
Luas27.5 ha
Tahun Tanam2008
TBS/ha Aktual2.18 ton/ha
Target2.87 ton/ha
Gap−24.0%
BJR21.8 kg (target ≥23.0)
AKP (Angka Kecukupan Panen)71% (target ≥85%)
MandorSuparman (MAN-0089)
AKP rendah — indikasi buah lewat matang
TBS/ha — 6 Bulan Terakhir
Revenue Forecasting — Prediksi Pendapatan
Proyeksi Pendapatan FY26
Rp 64.8 Miliar
Realisasi YTD
Rp 16.5 Miliar
Proyeksi Q2 2026
Rp 17.2 Miliar
Akurasi Model
94.2 %
Proyeksi Pendapatan 12 Bulan ke Depan
Realisasi Proyeksi Interval Konfiden 95%
Asumsi Model
Harga CPO Avg (Rp/kg)
Produksi TBS Q2 (ton)
OER Target (%)
Kurs USD/IDR
Sensitivitas Harga CPO
Harga CPOPendapatan FYvs Base
Rp 9.500/kgRp 53.4 M−17.6%
Rp 10.500/kgRp 59.0 M−8.9%
Rp 11.500/kg (Base)Rp 64.8 M
Rp 12.500/kgRp 70.4 M+8.6%
Rp 13.500/kgRp 76.1 M+17.4%
Benchmark Antar Estate — Perbandingan Kinerja
Estate Terbaik
TBS/ha tertinggi
Sei Rokan
3.12 ton/ha
OER Terbaik
23.8 %
Cost/Kg TBS Terendah
Rp 892 /kg
Gap Terbesar
Antara estate
+18 %
Perbandingan KPI — April 2026
EstateLuas (ha)TBS/havs TargetOER (%)BJR (kg)Cost/kgAKP (%)Rank
Sei Rokan 3.8403.12+8.7% 23.824.1Rp 89294% #1
Mandah 2.6402.91+1.4% 23.423.7Rp 94088% #2
Buatan 2.1122.64−8.0% 22.922.8Rp 1.02479% #3
Perbandingan TBS/ha — 12 Bulan
Inisiatif Peningkatan — Estate Buatan
Gap terbesar: TBS/ha 8% di bawah target. Rencana aksi:
Audit soil test seluruh blok (Mei 2026)
Perbaikan jadwal pemupukan MOP (Jun 2026)
Training mandor AKP (Apr 2026)
Penambahan tenaga panen (Mar 2026)
Review sensus pokok (Jul 2026)
Optimasi rute TPH (Mei 2026)
Advanced Analytics — Statistik Multivariat & Korelasi Produksi
Korelasi BJR vs Curah Hujan
r = 0.74
Korelasi kuat positif
Lag Effect Optimal
45 hari
Pemupukan → panen
R² Model Prediksi
0.89
Akurasi regresi multivariat
Outlier Terdeteksi
12 blok
Perlu investigasi lanjut
Distribusi BJR per Blok
Mean24.1 kg
Median23.8 kg
Std Dev±2.4 kg
Skewness-0.18
Lag Effect Analysis — Pemupukan vs Panen
Korelasi tertinggi pada lag 45 hari — pupuk MOP menunjukkan dampak nyata pada BJR setelah 6–7 minggu aplikasi.
Cost vs Production Cross-Analysis — per Blok
High Prod / Low Cost — Efisien (68 blok)
High Prod / High Cost — Perlu efisiensi (42 blok)
Low Prod / Low Cost — Potensi (87 blok)
Low Prod / High Cost — Prioritas perbaikan (43 blok)
Top 5 Blok Prioritas Perbaikan
BlokProduksiBiaya/kgKuadranRekomendasi
C023.8 ton/haRp 1.205DAudit PHT + Pupuk
E034.2 ton/haRp 980CReview rute panen
B073.5 ton/haRp 1.140DReplanting assessment
D044.0 ton/haRp 960COptimasi pemupukan
A064.5 ton/haRp 920BMonitor kehadiran
Matriks Korelasi — Faktor Produksi
Pearson correlation · 12 bulan terakhir
BJR
Curah Hujan
Pupuk
AKP
Umur Pohon
PHT
BJR
1.00
0.74
0.61
0.58
-0.42
0.31
Curah Hujan
0.74
1.00
0.28
0.09
-0.18
0.22
Pupuk
0.61
0.28
1.00
0.34
-0.25
0.52
AKP
0.58
0.09
0.34
1.00
-0.11
0.29
Umur Pohon
-0.42
-0.18
-0.25
-0.11
1.00
-0.38
PHT
0.31
0.22
0.52
0.29
-0.38
1.00
Kuat (≥0.6) Sedang (0.4–0.6) Lemah (0.1–0.4) Negatif Tidak signifikan