DCF Analysis · NPV per Blok · Analisis Sensitivitas · Market Comparison · Report Generator
FY 2026
DCF Calculator — Valuasi Discounted Cash Flow
Parameter DCF
Asumsi Operasional
Asumsi Finansial
NPV Total
Rp 284,7 M
+58% vs Book Value
IRR
18.4 %
vs WACC 12.5%
Payback Period
7.2 tahun
Discounted payback
NPV/ha
Rp 33,1 Jt
Per hektar produktif
Proyeksi Cash Flow 25 Tahun
Ringkasan DCF (5 Tahun Pertama)
| Tahun | Revenue (Rp M) | EBITDA (Rp M) | FCF (Rp M) | PV FCF (Rp M) |
|---|---|---|---|---|
| 2026 | 64.8 | 37.3 | 29.8 | 26.5 |
| 2027 | 68.2 | 39.8 | 31.9 | 25.2 |
| 2028 | 71.8 | 42.1 | 33.7 | 23.7 |
| 2029 | 74.5 | 44.3 | 35.4 | 22.2 |
| 2030 | 77.2 | 46.0 | 36.8 | 20.5 |
Analisis Sensitivitas — Dampak Perubahan Variabel terhadap NPV
Tornado Chart — Sensitivitas NPV
Perubahan ±20% dari asumsi base case
Heatmap NPV (Rp Miliar)
Harga CPO vs WACC
| Harga CPO ↓ / WACC → | 10.0% | 11.0% | 12.5% | 14.0% | 16.0% |
|---|---|---|---|---|---|
| Rp 9.500/kg | 182 | 168 | 148 | 128 | 102 |
| Rp 10.500/kg | 228 | 210 | 185 | 162 | 130 |
| Rp 11.500/kg (Base) | 322 | 298 | 285 | 248 | 198 |
| Rp 12.500/kg | 418 | 385 | 348 | 302 | 242 |
| Rp 13.500/kg | 512 | 472 | 426 | 370 | 295 |
Analisis Skenario (Bear / Base / Bull)
| Parameter | Bear Case | Base Case | Bull Case |
|---|---|---|---|
| Harga CPO (Rp/kg) | 9.500 | 11.500 | 13.500 |
| TBS/ha (ton) | 19.8 | 22.4 | 25.0 |
| WACC (%) | 14.5 | 12.5 | 10.5 |
| Growth Rate (%) | 1.0 | 2.0 | 3.5 |
| Biaya Operasi (Rp/kg) | 1.080 | 920 | 800 |
| NPV Total (Rp M) | 148 | 285 | 476 |
| IRR | 9.8% | 18.4% | 28.2% |
| NPV/ha (Rp Jt) | 17.2 | 33.1 | 55.4 |
NPV per Blok — Block-Level Valuation
NPV Total (Semua Blok)
Rp 284,7 Miliar
Blok NPV Positif
284 blok (93.7%)
Blok NPV Negatif
19 blok (6.3%)
Avg NPV/ha
Rp 33,1 Juta/ha
Top & Bottom 10 Blok per NPV/ha
| Blok | Luas (ha) | Tahun Tanam | TBS/ha | NPV/ha (Rp Jt) | NPV Total (Rp Jt) |
|---|---|---|---|---|---|
| D1-A02 | 34.2 | 2012 | 3.42 | 48.2 | 1.648 |
| D2-C01 | 33.1 | 2010 | 3.28 | 44.8 | 1.483 |
| D1-B04 | 29.8 | 2013 | 3.21 | 43.1 | 1.284 |
| D3-A01 | 31.5 | 2011 | 3.15 | 41.5 | 1.307 |
| D2-A01 | 32.4 | 2009 | 3.05 | 38.2 | 1.238 |
| · · · | |||||
| D3-C08 | 22.1 | 2001 | 1.82 | 8.4 | 186 |
| D1-D12 | 18.7 | 1999 | 1.54 | 2.1 | 39 |
| D2-B11 | 20.4 | 1998 | 1.38 | −4.2 | −86 |
| D3-D09 | 17.8 | 1998 | 1.24 | −8.7 | −155 |
| D1-E14 | 15.2 | 1997 | 1.08 | −15.3 | −233 |
Distribusi NPV/ha per Blok
Rekomendasi Replanting
19 blok dengan NPV negatif — kandidat replanting:
NPV negatif19 blok · 312 ha
Biaya replanting est.Rp 14,0 Miliar
NPV pasca-replantingRp +28,4 Miliar
ROI replanting+103%
Market Analysis — Perbandingan Pasar & Harga CPO
Harga CPO Rotterdam
USD 851 /MT
+2.4% MoM
Harga CPO Domestik
Rp 11.520 /kg
+1.8% WoW
Harga Minyak Sawit Mentah
MYR 4.210 /MT
−0.8% MoM
Spread Lokal vs Rotterdam
−USD 48 /MT
Normal range
Tren Harga CPO — 12 Bulan
Comparable Companies (EV/ha)
| Perusahaan | Ticker | EV/ha | P/E | Yield (%) |
|---|---|---|---|---|
| Astra Agro Lestari | AALI | Rp 45 Jt | 12.4x | 4.2% |
| Sampoerna Agro | SGRO | Rp 38 Jt | 10.8x | 5.1% |
| Salim Ivomas Pratama | SIMP | Rp 29 Jt | 8.2x | 3.8% |
| PP London Sumatra | LSIP | Rp 35 Jt | 9.5x | 6.2% |
| PT ANS (AGRODIA) | Private | Rp 33 Jt | — | — |
Market Drivers — Apr 2026
Biodiesel mandate B40 Indonesia efektif Jan 2026
EUDR enforcement ditunda ke Jul 2026 (positif jangka pendek)
El Niño: risiko penurunan produksi Q3 2026
Ekspansi soybean Argentina: tekanan harga minyak nabati
Permintaan India meningkat 12% YoY
Report Generator — Laporan Valuasi
Konfigurasi Laporan
Bagian yang Disertakan
Riwayat Laporan
8 laporan
| Laporan | Tanggal | Pembuat | Format | |
|---|---|---|---|---|
| Valuasi FY2026 Q1 | 15 Apr 2026 | Admin Finance | ||
| Due Diligence — Bank Mandiri | 01 Mar 2026 | CFO | Excel+PDF | |
| Valuasi FY2025 Annual | 20 Jan 2026 | Admin Finance | ||
| Replanting Proposal Buatan | 10 Nov 2025 | Direktur | PPTX | |
| M&A Screening Report | 15 Sep 2025 | CFO |
Preview — Executive Summary
PT AGRO NUSANTARA SEJAHTERA
LAPORAN VALUASI KEBUN — APRIL 2026
LAPORAN VALUASI KEBUN — APRIL 2026
Metode: Discounted Cash Flow (DCF) & Comparable Company Analysis
Nilai Wajar (Fair Value): Rp 284,7 Miliar
Net Present Value: Rp 284,7 M pada WACC 12,5%
Internal Rate of Return: 18,4%
Payback Period: 7,2 tahun
Lahan Produktif: 8.592 ha di 3 estate
Rekomendasi: Harga wajar Rp 33,1 Jt/ha. 19 blok (312 ha) direkomendasikan replanting.
Production Curve — Model Produksi Berbasis Umur Tanaman
Puncak Produksi
28,4 T/ha
Umur 12–16 tahun
Rata-rata Aktual
22,8 T/ha
Vs proyeksi 23,6 T/ha
Blok Diatas Kurva
142 blok
47% dari total aktif
Blok Perlu Review
38 blok
>15% di bawah kurva
Kurva Produksi Standar (TBS/ha)
Parameter Kurva
| Umur (Tahun) | Standar (T/ha) | Aktual (T/ha) | Faktor Adj. | Status |
|---|---|---|---|---|
| 3 | 8,5 | 8,2 | 0.96× | Review |
| 5 | 14,2 | 13,8 | 0.97× | Review |
| 8 | 22,0 | 22,4 | 1.02× | Atas Kurva |
| 12 | 27,8 | 28,4 | 1.02× | Atas Kurva |
| 16 | 28,2 | 27,9 | 0.99× | Normal |
| 20 | 24,5 | 23,8 | 0.97× | Normal |
| 25 | 18,0 | 15,2 | 0.84× | Replanting |
Deviasi Per Blok vs Kurva Standar
Atas kurva (>5%)
Normal (±5%)
Bawah kurva (5–15%)
Jauh di bawah (>15%)
Rekomendasi Replanting Berbasis Kurva
| Blok | Umur (th) | Luas (ha) | Prod Aktual | Kurva Standar | Deviasi | NPV Replanting | Prioritas |
|---|---|---|---|---|---|---|---|
| B-024 | 27 | 28,5 | 12,4 T/ha | 16,8 T/ha | -26% | +Rp 4,2 M | Segera |
| B-031 | 25 | 22,0 | 14,1 T/ha | 18,0 T/ha | -22% | +Rp 3,1 M | Segera |
| B-018 | 26 | 18,3 | 13,8 T/ha | 17,2 T/ha | -20% | +Rp 2,8 M | Tahun Ini |
| B-042 | 24 | 31,2 | 17,2 T/ha | 20,1 T/ha | -14% | +Rp 1,9 M | 2027 |
| B-057 | 23 | 25,8 | 18,8 T/ha | 21,8 T/ha | -14% | +Rp 1,7 M | 2027 |
Due Diligence — Paket Data Room & Laporan Kelayakan
Kesiapan DD
84%
87 dari 104 item lengkap
Dokumen Legal
32 / 36
4 dokumen pending
Temuan Risiko
3 item
Risiko Sedang
Estimasi Closing
Q3 2026
±45 hari dari target
Progress per Kategori
84% Siap
Legal & Perizinan
89%
32/36
Lingkungan (AMDAL)
100%
12/12
Keuangan
83%
15/18
Teknis & Infrastruktur
75%
9/12
SDM & Ketenagakerjaan
77%
17/22
Sertifikasi (RSPO/ISPO)
100%
4/4
Temuan Risiko
Risiko SedangLegal
HGU Blok B-031 sd B-040 — masa berlaku 2028
Perpanjangan HGU diperlukan sebelum closing. Perlu konfirmasi BPN.
Ajukan perpanjangan HGU Q2 2026
Risiko SedangTeknis
Jembatan akses Estate Selatan — beban 20T
Kapasitas jembatan tidak mendukung truk 30T. Perlu upgrade atau rute alternatif.
Estimasi biaya perbaikan Rp 2,8 M
Risiko RendahSDM
3 PKB (Perjanjian Kerja Bersama) berakhir Des 2026
Perlu negosiasi ulang PKB setelah akuisisi. Potensi permintaan kenaikan upah.
Siapkan tim HR integration post-closing
Checklist Dokumen DD
| Dokumen | Kategori | Wajib | Status | Tanggal Upload | Keterangan |
|---|---|---|---|---|---|
| Sertifikat HGU (3 estate) | Legal | Wajib | Lengkap | 12 Jan 2026 | — |
| AMDAL & UKL-UPL | Lingkungan | Wajib | Lengkap | 8 Jan 2026 | — |
| Laporan Keuangan Audit 3 tahun | Keuangan | Wajib | Lengkap | 15 Jan 2026 | Periode 2023–2025 |
| Sertifikat RSPO & ISPO | Sertifikasi | Wajib | Lengkap | 5 Jan 2026 | Berlaku sd 2027 |
| Laporan Teknis Infrastruktur | Teknis | Wajib | Pending | — | Menunggu inspeksi lapangan |
| Daftar Aset & Inventaris Pabrik | Teknis | Wajib | Pending | — | ETA 28 Apr 2026 |
| PKB & Perjanjian Karyawan | SDM | Wajib | Lengkap | 10 Jan 2026 | 3 PKB berlaku sd Des 2026 |
| Peta Blok & GIS Data | Teknis | Opsional | Lengkap | 3 Jan 2026 | SHP & KMZ tersedia |
| Laporan Produksi 5 Tahun | Keuangan | Wajib | Pending | — | Rekapitulasi TBS & CPO |
Timeline Due Diligence
Inisiasi & NDA
3 Jan 2026 · Selesai
NDA ditandatangani, tim DD dibentuk, akses data room diberikan
Legal Review
15 Jan – 10 Feb 2026 · Selesai
HGU, perizinan, AMDAL — 4 temuan minor, semua teratasi
Financial Review
10 Feb – 15 Mar 2026 · Selesai
Laporan keuangan 3 tahun, cashflow, piutang, utang
Technical Inspection
20 Mar – 30 Apr 2026 · Sedang Berjalan
Inspeksi pabrik, jembatan, infrastruktur, kapasitas mesin
HR & Compliance Review
1 – 20 Mei 2026
PKB, struktur karyawan, compliance K3, litigasi
Final DD Report & Negosiasi
Juni 2026
Kompilasi laporan, price adjustment, signing SPA
Virtual Data Room
248Total Dokumen
12Pengguna Aktif
1.842Tampilan Hari Ini
| Pengguna / Tim | Akses | Aktivitas Terakhir | View |
|---|---|---|---|
Budi Santoso Lead DD — Investor | Full Access | 1 jam lalu | 342 |
Hukum & Kebijakan LLP Legal Advisor | Legal Folder | 3 jam lalu | 218 |
Ernst & Mitra Financial Auditor | Finance Folder | Kemarin | 189 |
Konsultan Agronomi PT Technical Inspector | Technical | 2 hari lalu | 124 |
Bank Mandiri — Credit Financing Party | Finance Folder | 3 hari lalu | 97 |
Aktivitas Data Room (7 Hari)